Location: Uruzgan, Afghanistan
Year: 2009-2011
Public Infrastructure
Construction of the 120 meter long Regak Prefabricated Steel Component Bridge and the Subsurface Investigation of Oshay Bridge. The work included demolition of existing bridge, survey alignment, construction concrete abutments, piers and pier caps, procurement and installation of prefabricated steel component bridge.
